SolvoPlan

From scope to a clear plan.

Turn project scope into a plan you can review, refine and deliver.

Generate

Turn your scope into delivery documents. Choose only the ones you need.

Control

Review changes, track versions and keep your delivery plan aligned.

Your scope. Your next steps.

Prepare your documents, then use Control when delivery changes.

  1. 01 · Upload

    Upload or paste a scope, SOW, or project brief. Text is extracted for this request — the original file is not kept.

  2. 02 · Review

    Run quality checks, review facts and gaps, and confirm what to generate.

  3. 03 · Generate

    Produce the delivery documents you need. Export when ready — results stay on screen for this session.

  4. 04 · Continue in Control

    Optionally hand results into Control to persist the project model, versions, and governed change workflow.

Documents available today

Start with one document or select a delivery pack.

  • Project Plan
  • Runbook / SOP
  • Transition Pack
Continue in Control

Security and privacy

Generate is memory-first: uploaded source files are not retained after text extraction, and results stay in this browser session unless you export them. Data you continue into Control is persisted on the server. Organisation profiles may remain in this browser. You can clear browser-stored SolvoPlan data from Organisation settings.

See it in action

Browse fictional example SOWs and representative plans, runbooks, and transition packs produced by SolvoPlan — no upload required.

All customers, suppliers and project details in these examples are fictional.

IT infrastructure

Campus structured cabling refresh

Cat6A backbone and horizontal cabling across three buildings, with certification, labelling, and as-built handover.

Statement of Work — Northbridge Campus Cabling Refresh

Customer: Northbridge Education Trust (fictional)
Supplier: Meridian Network Services Ltd (fictional)
Sites: Building A (admin), Building B (teaching), Building C (data hall annex)
Duration: 12 weeks from kick-off

1. Scope

Design, supply, install, and certify a Category 6A structured cabling system:

  • Replace ageing Cat5e horizontal runs (~480 outlets) with Cat6A
  • New 24-core single-mode fibre backbone Building A ↔ B ↔ C
  • New floor distributors (FD) and consolidate legacy patching
  • Permanent link certification to ISO/IEC 11801 Class EA
  • Labelling per customer standard NS-CAB-03 and as-built documentation pack

2. Out of scope

Active network equipment, Wi-Fi APs, server migration, and electrical works beyond containment provided by others.

3. Assumptions

  • Access windows: evenings 18:00–22:00 weekdays; Saturday 08:00–16:00
  • Customer provides floor plans, existing M&E drawings, and escort for restricted areas
  • Containment pathways are usable; remedial containment is charged as a change

4. Deliverables

  1. Detailed design pack (rack elevations, outlet schedule, labelling plan)
  2. Installed and certified cabling plant
  3. Certification reports (PDF + native tester export)
  4. As-built drawings and asset register
  5. Knowledge transfer session for campus facilities & IT

5. Acceptance

Permanent links pass Class EA. Labelling matches NS-CAB-03. As-builts signed by Customer Technical Lead within 10 business days of practical completion.

6. Roles (customer)

Project Sponsor · Technical Lead · Facilities Manager · Security Office

Ready to generate from your scope?

Sign in, add a brief, and produce your first Quick pack.

Start planning